Description
This change order is to update details on existing order. All details are updated below.
| Amount of product ordered: | 1 |
| Fabric: |
CF- CB800-242 |
| Image: | ![]() |
| Dimensions: | 3″ x 109″ front x 42.75″ back x 24″ deep x 39″ angle sides x 3.5″ sides |
| Piping (if available for this product): |
Add Piping
Cushion will have top and bottom piping along the edges. ![]() |
| Foam (if available for this product): | 3″ thick foam with 1″ dacron wrap – client to confirm thickness when samples arrive. |
| Tufting (if available for this product): |
No Tufting
![]() |
| Special order notes: (if any) |
– full length zipper
———————————————————————– Original quote 3″ with piping $953.10 Less amount paid ($579) Add $69 new fabric Project Balance – 443.10 77U37.25.16 |





