Description
Indoor Window Seat Cushion – CHANGE ORDER
Amount of product ordered: | 2 |
Fabric: | ![]() |
Custom Fabric Selection: | Crypton Sky Linen |
Dimensions: | Cushion #1 – 3″ x 20.5″ x 81.5″ Custom Shape – See drawing
Cushion #2 – 3″ x 19″ x 40.75″
|
Piping (if available for this product): |
Add Piping
Cushion will have a single fabric piping (cording/welting) along the seam. All piping is cut on the bias, giving it an angled appearance. ![]() |
Foam (if available for this product): | 3″ thick foam with 1″ dacron wrap |
Tufting (if available for this product): |
Button Tufting
Button Tufting gives an extra padded, pretty pleated accent to any cushion. Choose the number of buttons and the depth for added detail. ![]() |
Special order notes: (if any) |
THIS CHANGE ORDER IS TO TAKE APART CUSHION #1 AND CUT DOWN THE BACK EDGE SO IT IS A PERFECT RECTANGLE WITH DEPTH OF 15 5/8″ |